Operate based on the best practice.
Turn plants running different spreadsheet conventions into one view of the business. Real-time OEE, downtime, and issue response, measured the same way at every site.
-
Replace the manual weekly roll-up with a live view.
-
See downtime and slow responses proactively.
-
Roll out in phases built for multi-site reality.
The problems we solve for
operations teams
Each plant keeps its own spreadsheets or boards, so a question from corporate means a manual roll-up. L2L gives corporate a live view of OEE, downtime, and issue response across every site, measured the same way.
A big-bang cutover puts the shift at risk, and the rollout often rests on one stretched champion. L2L starts at one plant or a few lines, needs no rip-and-replace of your existing systems, and standard implementation takes 14 to 60 days.
What operations teams get
-
OEE MonitoringAPQ monitoring across sitesAPQ monitoring across sites
-
Cross-Site ComparisonCompare sites across the enterpriseCompare sites across the enterprise
-
Downtime TrackingPredictable standardizationPredictable standardization
-
IntegrationsConnect with your tech stackConnect with your tech stack
See live OEE by line and site in one view, without the weekly roll-up.
Compare plants, departments, and product lines, and watch output, defect rates, and on-time delivery next to OEE and downtime.
Sync spares and inventory with your ERP, load the production order schedule, and connect SCADA and IIoT data.
-
OEE MonitoringAPQ monitoring across sitesAPQ monitoring across sites
See live OEE by line and site in one view, without the weekly roll-up.
-
Cross-Site ComparisonCompare sites across the enterpriseCompare sites across the enterprise
Compare plants, departments, and product lines, and watch output, defect rates, and on-time delivery next to OEE and downtime.
-
Downtime TrackingPredictable standardizationPredictable standardization
A line that crosses a metric threshold you set can open an issue and escalate automatically. -
IntegrationsConnect with your tech stackConnect with your tech stack
Sync spares and inventory with your ERP, load the production order schedule, and connect SCADA and IIoT data.
How L2L works in real life
Review each site’s response times and downtime against your thresholds, and set the next site’s start date.
Brent from ADAC
“Prior to L2L, everybody had their own isolated packets of information. Now with L2L, we have a single point of truth that all of us can use to problem solve.”
Jason from Sonoco
“By responding to real-time data, we have avoided costly unplanned catastrophic failures. So far, we’re happy with the results.”
Phil from Purple
“The implementation was extremely fast. L2L had every step of the process handled at an incredible pace and truly provided a solution that helped our team understand why and what this platform meant for them. This sets them apart.”
Even better operations with the help of AI
When a line slows or output drops, L2L Execution AI shows which factors are costing you the most availability and where action is stalled, so your team knows where to look first.
Your team makes the call, and AI briefs each shift on the work that needs attention now, so nothing important waits for the weekly review.
More about operations with L2L
L2L Production
Production management that keeps execution moving at the same speed as the plan - across every line, every shift, every site.
CASE STUDY:
ADAC Reduced Downtime with L2L
See how ADAC improved OEE by 15% while improving on-time preventive maintenance by 376%.
The Manufacturing Downtime Report
Want to save millions? Get to the root of unplanned downtime.
Alarming data: 60% of manufacturing leaders report six- and seven-figure losses from downtime alone.
Frequently asked questions about L2L for operations teams
How do we roll L2L out across multiple sites without disrupting production?
Start with one plant or a few lines, prove it, then repeat at the next site. Standard implementation takes 14 to 60 days with no rip-and-replace. ADAC monitors over 200 production lines, and Worthington runs L2L in seven locations.
What changes with real-time vs. weekly or monthly reporting, day to day?
OEE and downtime update as production happens, so the review starts from live numbers instead of a roll-up someone compiled. BorgWarner’s analysis went from a week to 20 minutes.
How does L2L integrate with our existing ERP?
L2L syncs with ERP systems to share spare parts and inventory levels and can load the current production order schedule. It complements your ERP rather than replacing it, bridging enterprise planning and real-time shop floor execution.
What’s a realistic phased rollout plan, from pilot to multi-site?
Standard implementation takes 14 to 60 days, with no rip-and-replace. L2L’s deployment methodology targets a live pilot by Week 2, standardized operations by Week 12, and optimized performance by Week 16.
How does L2L coexist with a working, if manual, current process?
What does the procurement and legal timeline look like for a multi-site enterprise deal?
L2L publishes its Cloud Services Agreement, Data Processing Addendum, and privacy policy in our Trust Center, so legal and IT can start review early. The overall timeline depends on your internal process.
Speak with a multi-site operations specialist
Discover how L2L connects your teams with real-time data and tools to reduce downtime through optimized manufacturing operations.
Manufacturing Intelligence
