Skip to the main content.

YOUR GOAL: REACH MAXIMUM OUTPUT

Plant productivity goes down when supervisors, managers, and frontline workers don’t have objective visibility into all floor activities. A lack of visibility can prevent them from identifying issues with line or flow imbalances, resulting in production bottlenecks.

But here's the good news: L2L’s modern approach to production management has helped customers achieve fast, dramatic efficiency gains, including:

  • 20% increase in the number of units produced
  • 15% increase in organizational capacity with improved labor efficiency
Performance
Hobson ROI Whitepaper Cover-1

SEE THE VALUE OF SUSTAINED IMPROVEMENTS IN AVAILABILITY

Hobson & Company, a third-party firm focused on ROI analysis, interviewed a wide sample of L2L customers to create an authoritative model of the economic benefits of using L2L. Customers in the study reported immediate and sustained improvement in performance metrics including: 
  • Overall Equipment Effectiveness (OEE)
  • Operational Availability (OA)
  • Throughput Rate
  • Cycle Time
  • Labor Efficiency
  • Labor Minutes Per Unit (LMPU)
  • Cost Per Unit
Download

WATCH HOW JELD-WEN INCREASED PRODUCTIVITY BY 44%

JELD-WEN, the world leader in window and door manufacturing, needed to modernize how it managed shop floor processes. With L2L, JELD-WEN was able to achieve a 44% performance lift in less than six months.

PERFORMANCE INSIGHTS FROM OUR BLOG

4 min read

A Modern Manufacturing Approach to Improving Tool Management

All too often, production halts due to tooling incidents. Operators can’t find the required tools during changeovers,...

Interview with Dart Container's Alex Pacheco: Operational Excellence

You don’t always have to overhaul your processes to improve them. Sometimes, digitizing them is all you need to do. In...

Q3 Product Announcement Video: Operator Portal

L2L's recent Q3 product announcement featured the Operator Portal - a powerful single-screen interface. Watch Eric...

LEARN HOW JELD-WEN ACCELERATED PERFORMANCE

JELD-WEN’s Dodson, Louisiana plant was awash in a sea of paper. Meetings were filled with handouts and Excel charts. Operators and technicians got paper instructions at the start of their shifts. These outdated paper-based methods limited process improvements, slowed decision-making, and ultimately capped production output.

Download the case study to learn how JELD-WEN used L2L to digitize shop floor processes and boost performance by over 44% in less than six months.