Case Study: Purple

How Purple Reduced their Equipment Downtime by 54% With L2L

Purple's leadership knew that the most important factor in any manufacturing enterprise is its production and without a best-in-class maintenance and operations management systems, downtime and other disruptors would continue to be an ever-present danger that would affect their bottom line.

So Purple set out to find a modern EAM/CMMS solution that would help keep the production lines moving, and saw how L2L could provide the real-time data needed to drive improved reliability in their plants.

The team quickly started seeing results such as:

  • 52% reduction in equipment failures
  • 54% reduction in equipment downtime
  • 42% increase in on-time completion of preventive maintenance events

To learn more about Purple's challenges, solutions, and results, download the full case study below.

Download this full case study today

 